Pipe End with Beveling Machines

Product Details
Customization: Available
Machine Name: Pipe End Facing and Beveling Machine
Application: Pipes and Tubes
Gold Member Since 2020

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Patents Awarded
The supplier had awarded 1 patents, you can check the Audit Report for more information
Full Customization
The supplier provides full customization services
OEM Services
The supplier provides OEM services for popular brands
Management Certification
The supplier has quality management system certification, including:
ISO9001:2015 certificate
to see all verified strength labels (10)
  • Pipe End with Beveling Machines
  • Pipe End with Beveling Machines
  • Pipe End with Beveling Machines
  • Pipe End with Beveling Machines
  • Pipe End with Beveling Machines
  • Pipe End with Beveling Machines
Find Similar Products

Basic Info.

Model NO.
SXHNGK
Delivery Time
5 Months
Payment
T/T, L/C
Training
According Your Requirements
Fob
Tianjin, China
Transport Package
Wooden Pallet
Specification
Metal
Trademark
SXHNGK
Origin
China
HS Code
8501109101
Production Capacity
5 Sets

Product Description

Pipe End Facing And Beveling Machine

The straight seam welded pipe/seamless pipe highly efficient pipe end facing and beveling machine is mainly used for processing the pipe end. The pipe end facing and beveling machine has profile beveling knife with beautiful beveling outlook. The beveling machine has automatic working mode with high efficiency, stable working, and reliable working.

The pipe end facing and beveling machine diameter range in our company is from Φ20 to Φ711mm. The wall thickness is from 1mm to 25mm. The pipe length is from 3m to 16m. The material is from Q235B to X100.

Production process:
Pipe loading-pipe connecting-left alignment-pipe feeding-clamping-left end facing and beveling -clamper loosen-pipe delivery-right alignment-clamping- right end facing and beveling -clamper loosen -pipe exit

Terms of payment
Buyer shall pay 30% of the total contract price of seller T/T for advance payment, and the contract shall take effect; the remaining balance 70% shall be paid after at sight the copy of B/L by T/T.
Delivery time
6-month delivery after the contract takes effect.
Installation and Commissioning
The seller provides on-site installation and guidance services. The seller's visas, round-trip airfare, meals, and accommodation are the responsibility of the buyer, and the seller's staff will pay USD 100 per person per day.
Training
The training is carried out in two steps.
Step 1: During the installation process, the seller's technicians will train the buyer's personnel on the structure, principle, maintenance, maintenance, operation, etc. of the equipment.
Step 2: After the test run, the seller's technicians will conduct 10 days of intensive training for the buyer's personnel until the buyer's personnel are fully capable of operating the equipment.
Following is not within Seller's supply scope
1)  All cables.
2)  Foundation and other components (flat horn, diagonal horn, foundation cover, pit cover, pipes and passages, adjustment pads, cable ducts and conduit covers, handrails for safety protection, pre-buried Steel plates, pipes and grounding, etc.).
3) For pipes, brackets and assembly materials from the TOP point to the equipment (from the main hydraulic station to the valve station; from the valve station to the hydraulic piping between the mechanical equipment, from the TOP point to the pneumatic piping of each equipment, from the TOP point to The steam and cooling water piping of the equipment, the wastewater piping from the equipment to the processing equipment, the buyer provides a detailed design of all TOP point pipe joints. The pipe on the seller's equipment is the scope of supply of the seller. The pipe interface point is 1000mm away from the outer edge of the equipment, and is equipped with a pair of flanges.
4) Steel structural parts (work platforms, brackets and stairs for containerized electrical control rooms, etc.) The seller provides basic data for this structure.
5) Safety gates and guards (safety guards for doors, grilles and rotating parts, etc.).
6) Inspection of the customer load basis based on the data of the seller's basic drawings.
7) All the required basic work, such as fences, cable trenches, cable trench covers, entrance ladders, work platforms, etc. The seller only provides a base map of the load.
8)  Basic waterproof measures.
9)  All metal parts in concrete, including hydraulic pipeline embedded parts, cable ducts, cable trays, trench cover and pit cover.
10) The user side organizes commissioning, trial operation, equipment optimization and acceptance of the test operator.
11) Hydraulic oil and lubricating oil (including initial filling) used during installation, commissioning and trial operation, on-site installation and commissioning of auxiliary switchboard power supply, compressed air, etc.
12) Materials used for trial operation, commissioning and acceptance, such as coils, bundled straps and other consumable materials.
13)  Cable tray and its installation.
14) Safety devices that are not part of the production line but need to be installed in the production line area, including safety bars, work platforms, and other required isolation devices.
15) Hydraulic oil and lubricating oil used in each single machine.
Note: The equipment handover point is in principle within 1 meter of the supply equipment, all pipelines of all electrical, pneumatic and cooling water systems within 1 meter are within the scope of supply. The following items are not included in the scope of supply:
Mounting horns for the installation of equipment, threading pipes;
Supply of energy media such as turbid water, net water, and compressed air.


Pipe End with Beveling Machines
Pipe End with Beveling Machines
Pipe End with Beveling Machines

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier